Loading
(806) 771-7722 info@groupnire.com
4415 71st St, Suite 24 Lubbock, Texas

Energy Storage: 1 MW Lithium-Ion Battery

CASE STUDY

1 MW Lithium-Ion Battery

Group NIRE and Texas Tech were selected to deploy a 1 MW Lithium-Ion Battery at Group NIRE's field Test site at the Reese Technology Center. With funds assisted from the DOE, Group NIRE is able to test and operate the 1 MW Lithium-Ion Battery in concert with the wind turbines and load currently in operation at the Reese Technology Center.

We Can Transform Your Business

Let's Start Innovating

Partner With Us