LiDAR Test Facility

In November of 2017, Group NIRE opened the first LiDAR testing facility within the United States. Utilizing an unused met tower, we were able to create a solution to a big set back within the industry. Previously, all LiDAR devices (Light Detection and Ranging devices) must be sent overseas to be tested and calibrated. This process can be extremely time consuming, typically ranging from six to eight-weeks, not including the time and expense that is related to shipping outside the U.S.

In order to provide the best experience to our customers, Group NIRE’s testing site is non-exclusive, meaning we give customers the option to use any third-party certification group to test and certify their LiDAR's. 